The project included the construction of a new Block D, partial renovation of Block B, and related construction work—a parking lot, fencing, a retention pond, a heat pump, and necessary utility lines and connections. The construction work, which lasted a total of 21 months, took place while the facility remained fully operational. It was therefore necessary to balance the demanding construction with the needs of the residents.