Road III/11822, Solenice

2025 Solenice 05

In 2025, we have prepared road III/11822 in Solenice for heavy loads – it will be used to transport components, especially turbines, needed for the reconstruction and modernization of the Temelín and Dukovany nuclear power plants. 

2025 Solenice 04

We have widened the road, built new base layers and constructed two massive retaining walls. Thanks to these modifications, vehicles over 50 meters long and weighing over 1,000 tons can now safely pass through the road – we have created a safe and stable corridor for them.