The long-planned reconstruction of the through road through the town of Kolinec has brought a change to the town in the form of a new roundabout, which replaced the original intersection to improve safety. The center of the new roundabout is adorned with a granite pyramid bearing the town’s coat of arms.

2023 Kolinec 03

As part of the bypass reconstruction, new sidewalks, sewer lines, water mains, and street lighting were installed. In the direction of Sušice, a new gabion wall was built at the end of the reconstructed bypass to stabilize the nearby slope.

2023 Kolinec 01

The construction of a new riverside promenade and a new bridge over Kalný Creek near the gas station also contributed to the revitalization of the town. Along the Baroque stone bridge, a new pedestrian footbridge was built in coordination with the National Heritage Institute, replacing the original, now inadequate footbridge. Interestingly, the beams for this footbridge were manufactured in Sweden.