Nové Chabry Apartment Buildings (Phases H and I)

Nové Chabry Apartment Buildings (Phases H and I)

Dolni Chabry 02

As general contractor, we completed ten residential buildings with 242 apartments for developer Star Group in Prague’s Dolní Chabry district. Phases H and I build on our partnership dating back to 2014, adding new homes in a green neighbourhood with local amenities and spaces for neighbours to meet.

Dolni Chabry 06

Designed by architecture studio LOXIA, the development connects buildings through green squares and footpaths. Apartments range from studios to four-bedroom homes, with balconies, roof terraces or private gardens. The neighbourhood also includes a nursery school, community centre, playgrounds and shops. A planned tram extension from Kobylisy, with a stop next to the development, aims to improve access to metro line C.

Dolni Chabry 08

Working with specialist divisions within our Group, we tackled challenging ground conditions. We excavated a 50,000 m³ construction pit and installed 572 foundation piles, each 900 mm in diameter and 7–19 metres long, using our own Casagrande drilling rigs. We used 19,500 m³ of concrete and 2,450 tonnes of reinforcing steel for the cast-in-place concrete structures. We coordinated the work of five tower cranes and 67 specialist subcontractors.

Dolni Chabry 03

We used Dalux and Buildary to support site management. Tablets gave site managers and technicians on-site access to current project documentation. They shared changes in real time and kept an electronic site diary. Each building had a dedicated technician to monitor quality and resolve clashes promptly.

Dolni Chabry 09

We completed 620 apartments across the first four phases between 2014 and 2021. We are now continuing with Proxima Chabry, which will add 147 apartments and bring the total to 1,009 on completion.

Through long-term partnership, our team’s expertise and digital site management, we are helping create a neighbourhood that combines quality homes, green spaces and everyday amenities.