Hořovice Eastern Bypass

Hořovice Eastern Bypass

Horovice 01

As part of a contractor consortium, we completed the 1.4-kilometer-long Hořovice Eastern Bypass. The new road diverts through traffic away from residential areas, relieves congestion in the city center, and contributes to safer and smoother traffic flow. We opened the entire route to drivers on August 20, 2026.

Horovice 02

The project includes four roundabouts, two bridges on the main route, and a pedestrian bridge connecting the residential area with the Bažantnice Forest Park.

Horovice 03

During construction, we dealt with a high water table as well as three exploratory boreholes up to 25 meters deep, which were not included in the original documentation. We also coordinated the project with the relocation of high-voltage power lines and the relocation of transformer stations. These circumstances put our teams’ experience to the test and demonstrated their ability to respond to unexpected conditions directly on the construction site.

Horovice 09

By completing the bypass, we have fulfilled the long-standing expectations of local residents and helped improve transportation access and living conditions in Hořovice.