D3 Highway, Nažidla – Dolní Dvořiště, State Border

D3 Highway, Nažidla – Dolní Dvořiště, State Border

D3 Otevreni 14

We completed a 3.5-kilometer section of the D3 Highway between Nažidla and Dolní Dvořiště for the Road and Highway Directorate. We opened the section to traffic on July 31, 2026, one month ahead of the contractual deadline. We began construction in January 2024.

D3 Otevreni 05

The new section brings Prague and České Budějovice closer to Austria via a high-capacity connection and relieves the area around Dolní Dvořiště of transit traffic on State Road I/3. At the end of the project, we also ensured a direct connection of the highway to the national border. Unlike the original plan, traffic no longer needs to pass through the new Dolní Dvořiště grade-separated interchange.

D3 Otevreni 09

Alongside the highway embankment, we built bridges, a grade-separated interchange, road realignments, and drainage systems. We engaged our specialized divisions for transportation infrastructure, bridge construction, and special foundation work. We leveraged their collaboration and expertise to address technically challenging situations.

D3 Otevreni 13

We also dealt with the discovery of wartime munitions, which required the intervention of bomb disposal experts, as well as historical environmental contamination at the site of a former gas station. To protect the rare freshwater pearl mussel in the Malše River, we built three retention basins and 4.55 kilometers of discharge piping. Together with other water management measures, these ensure the sustainable management of stormwater and the protection of valuable natural sites.

D3 Otevreni 08

Thanks to the team’s dedication and careful coordination, we handed over the section to drivers a month ahead of schedule, facilitating smoother traffic flow in southern Bohemia as well as cross-border connections with Austria.