Although this is a relatively short section, it was technically one of the most challenging transportation projects. The route runs through the natural floodplain of the Ploučnice and Šporka rivers, which regularly floods—sometimes several times a year—during heavy rains or snowmelt. These conditions had to be taken into account in the design of the bridge structures, foundations, and drainage systems, as well as in the organization of the work itself.