The three-meter-wide path for pedestrians and cyclists is designed in close proximity to the Olšava River. A requirement of the investor, the City of Bojkovice, was to allow for the unimpeded movement of maintenance vehicles from Povodí Moravy, which led to the construction of access ramps to the river.