We at Swieteláci have completed the construction of the sound barrier along Highway D1 before Prague.
During the construction we had to perform sheet piling along the entire length of the wall due to the required load-bearing capacity of the substrate. During the final installation of the mobile sound barrier, 250-ton cranes helped, which gradually placed one acoustic panel after another between the steel columns over the course of one week.
The project was carried out by our team from the Prague area of the Transport Construction STŘED plant.