We at Swieteláci built a new section of the cycle path, connecting the municipalities of Záhorovice and Bojkovice in the Zlín Region.
The kilometer-long and 3-meter-wide path made of cement concrete offers an attractive route close to the Olšava River.
A notable feature of the entire construction was the laying of️ the cement concrete surface, which was not done mechanically, but rather used formwork technology.
The construction was carried out by our team from the Transport Construction MORAVA division, in the Zlín area.



